May 23, 2022
I can only speak from my experience, and it’s only a guess. At some point the PM team owned all the success metrics, and that’s when Engineering lost the leverage. IMO, this can only happen as a direct result of senior management preference. Engineering then became more of a background support and no longer had equal weight at the table.